Paving Calculator

Calculate how many pavers, joint sand, bedding material and sub-base you need, then estimate paving costs in metric or imperial units.

Sand-set, running bond, 5% waste, 25 mm bedding, 100 mm sub-base, 50 mm paver thickness.

Area Shape

Dimensions

m
m

Paver Size

mm
mm
mm
mm

Pattern

Running BondWaste: 5%

Installation

Sand bedding plus joint sand or polymeric sand. Suitable for interlocking pavers in pedestrian and vehicular applications.

Kiln-dried sand swept into joints. Economical; may need periodic topping up.

mm
mm
kg
kg
%

Total Pavers Needed

Running Bond · 5% waste · Sand-Set (Bedding Sand)

754pavers

718 base+36 waste47.8 /m²

Project Area & Paver Density

5 m × 3 m

Project Area
15.00 m²
161.46 ft²
Paver Density
47.8 /m²
Paver: 200×100 mm, joint: 3 mm

Materials Breakdown

Sand-Set (Bedding Sand) · 25 mm bedding · 100 mm sub-base · 50 mm paver

Joint Sand
54.0 kg
3 × 25 kg bags
Bedding Sand
0.60 tonnes
24 × 25 kg bags · 25 mm depth
Sub-base Stone
3.00 tonnes
100 mm depth · ~2.0 t/m³ density
Sand density: 1.6 t/m³ · Sub-base: 2.0 t/m³ · Joint Sand: sand-based

Paver Count & Waste

Running Bond pattern · 5% waste factor

Base Count
718 pavers
Calculated from area ÷ effective paver size (rounded up)
Waste
36 pavers (+5%)
Pattern: Running Bond · 5% waste
Total
754 pavers
Rounded up — always buy a few extra for cuts

What Is a Paving Calculator?

Estimate pavers, sand, sub-base, and installed cost for patios, driveways, and walkways

A Paving Calculator helps you determine exactly how many pavers, joint material bags, bedding material, and sub-base stone you need for your paving project. Whether you are laying a patio, driveway, garden path, or circular area, accurate material estimation saves money and prevents multiple trips to the supplier.

5 Patterns

Running Bond

Herringbone, Basketweave & more

4 Shapes

Rectangle, Circle

L-Shape & Custom Area

Free

No sign-up

Unlimited calculations

Used by: DIY homeowners, landscapers, contractors, and builders to plan patio, driveway, and walkway projects. The calculator accounts for joint spacing, pattern waste, paver thickness, bedding depth, sub-base thickness, and separate configurable joint-material and bedding-material bag weights weights — details that basic “area divided by brick size” calculators miss. Supports both metric and imperial units with multi-currency installed-cost estimation. For asphalt or blacktop projects, see our Asphalt Calculator.

How Is the Paver Count Calculated?

The formulas behind paver and material estimation

The calculation uses four steps: find your project area, divide by the effective paver size (including joints), apply a pattern-based waste factor, then compute joint material, bedding, and sub-base volumes from area and depth.

1

Area

Area (m²) = Length × Width

For rectangles: length × width. For circles: π × (diameter ÷ 2)². For L-shapes: sum of two rectangles. The calculator converts imperial units to metric automatically.

2

Paver Count

Pavers = Ceil(Area ÷ ((PaverL + Joint) × (PaverW + Joint)))

The effective paver size includes half a joint width on each side. For example, a 200×100 mm paver with 3 mm joints covers 0.0209 m² (not 0.02 m²). Always round up.

3

Waste

Total Pavers = Base × (1 + Waste% ÷ 100)

Waste varies by pattern: running bond 5%, stacked bond 3%, herringbone 10%, basketweave 12%. You can override with a custom waste percentage for irregular areas.

4

Materials

Volume = Area × Depth; Weight = Volume × Density

Joint material uses the total joint length and paver thickness. Bedding sand/mortar uses the user-set bedding depth. Sub-base uses area × sub-base depth at 2.0 t/m³ density. Bags are calculated from separate configurable joint-material and bedding-material bag weights.

Worked Example: 5 m × 3 m Patio with Running Bond

  • Area = 5 × 3 = 15 m²
  • Paver: 200×100 mm, Joint: 3 mm → Effective area = 0.203 × 0.103 = 0.0209 m²
  • Pavers per m² = 1 ÷ 0.0209 ≈ 47.8
  • Base pavers = Ceil(15 × 47.8) = 718
  • Waste (5% running bond) = Ceil(718 × 0.05) = 36
  • Total pavers = 718 + 36 = 754 pavers
  • Joint sand (50 mm thickness) = 15 m² × 15 per-m² joint length × 0.003 m joint × 0.050 m thickness × 1600 kg/m³ = 54 kg (3 × 25 kg bags)

Paver Patterns & Waste Factors

How your laying pattern affects material requirements

Different laying patterns require different amounts of cutting and therefore produce varying waste. Below is a comparison of the five supported patterns.

PatternWasteDifficulty
Running Bond5%Easy
Stacked Bond3%Easy
Herringbone 45°10%Moderate
Herringbone 90°10%Moderate
Basketweave12%Moderate

Pro tip

Waste factors are industry-standard estimates. Actual waste depends on your specific layout, the shape of your area, and cutting skill. Always buy at least 5% extra even for simple patterns, and consider 2–3% extra for future repairs since pavers from different production batches can vary in colour.

Sand-Set vs Mortar-Set Installation

Choosing the right installation method for your project

Sand-Set

Sand-set installation uses a compacted sand bed (default 25 mm) with pavers laid directly on top and joint sand or polymeric sand swept into the gaps. This is the standard method for interlocking concrete pavers in both pedestrian and vehicular applications, as recommended by CMHA construction guidance.

  • Easier DIY, good drainage, permeable
  • Individual pavers can be replaced easily
  • Suitable for patios, walkways, and driveways
  • Joint sand or polymeric sand for joints

Mortar-Set

Mortar-set installation uses a mortar bed with pavers bedded into wet mortar and jointing mortar/compound applied to joints. This method is typically used for compatible slabs or natural stone rather than as a blanket driveway recommendation. See CMHA mortar-set guidance.

  • Stronger bond for slabs and stone
  • Resists weed growth and ant infestation
  • Higher cost, professional installation recommended
  • Harder to repair individual pavers

Which should you choose? Sand-set interlocking pavers are appropriate for both pedestrian and vehicular applications when properly installed with a compacted sub-base. Mortar-set is better suited to compatible slabs, stone, or areas requiring a rigid bond. The presets in this calculator provide planning defaults — always confirm with manufacturer product specifications and local requirements for your specific project conditions, soil type, and climate.

Common Mistakes to Avoid

Get your paving estimates right the first time

Forgetting waste for cuts

Even for perfectly rectangular areas, you will need to cut pavers at the edges. Always add at least 5% waste for running bond, up to 12% for basketweave. Ordering the exact calculated count guarantees you will run short.

Ignoring joint width

A 3 mm joint may seem small, but over 15 m² it reduces the paver count by 5–10%. Always account for joint spacing. Wider joints need more joint material but fewer pavers.

Underestimating sub-base depth

100 mm is a common planning starting point for patios and 150 mm for driveways, depending on soil, loading, and local requirements. Skimping on sub-base can lead to sinking and uneven surfaces. Compact in layers no thicker than ~75 mm each.

Using the wrong sand

For joints, use kiln-dried sand or polymeric sand. Building sand is not recommended for paving joints — it can contain clay and organic matter. Use the jointing material specified by your paver manufacturer. For bedding, use sharp sand or grit sand.

Not planning edge restraints

All paved areas need edge restraints (concrete haunching, metal or plastic edging) to prevent pavers from spreading. Without them, the outer pavers can shift over time. Add edge restraints to your materials list and budget.

Key Considerations & Pro Tips

Tips for a successful paving project

Always round up

Pavers are sold individually or by the pallet. Always round up your count — it is better to have a few extra than to run short mid-project. Pallet quantities vary by product and supplier; some 200×100 mm pavers ship 400–500 per pallet.

Compact the sub-base properly

Sub-base stone must be compacted in layers (max 75 mm per lift) using a plate compactor, not hand tamping. Uncompacted stone will settle over time. The calculator assumes fully compacted density at 2.0 t/m³.

Use polymeric sand for joints

Polymeric sand contains polymers that harden when wet, helping to resist weed growth and ant infestation. Select it as the joint material in the calculator to see the bag count.

Plan for drainage slope

Patios and driveways should slope away from buildings at 1:60 to 1:100 (about 10–17 mm per metre). This does not affect material quantities but is critical for preventing water pooling and damp issues.

Order extra for batch consistency

Pavers from different production batches can vary noticeably in colour and texture. Order 2–3% extra with your main order and store them for future repairs or modifications. Mix pavers from different pallets during installation to blend any slight colour variations.

Related Calculators

For complementary material calculations, see our Sub-Base Calculator, Sand Calculator, and Asphalt Calculator. These estimates are for planning purposes only. Material densities (sand: 1.6 t/m³, sub-base: 2.0 t/m³, mortar: 2.0 t/m³) are industry averages. Actual values vary by source, moisture content, and compaction. Always confirm quantities with your supplier and refer to manufacturer/local specifications for your specific project conditions.

Frequently Asked Questions

Common questions about paving calculations, costs, and installation

Embed Paving Calculator

Add this calculator to your website or blog for free.